Development of the plant series INTEC RC 500/05, currently the most modern rubber powder production plant in the world

Erection and commissioning of the plant series INTEC RC 400/04

Overview of the tyre recycling plant

Assembly series INTEC RC 400/04

Pre-crushing/shredder

Automatic big-bag weighing station

Electric and control cabinets

Erection and commissioning of the plant series INTEC RC 400/03

Pre-cooling tunnel (I and II)Electric and control cabinets

Sieb- und Windsichterstation

Pre-cooling tunnel (I and II)Electric and control cabinets

Sieve- and wind-sifter station

Erection and commissioning of the plant series INTEC RC 400/02

Pre-shredding

Pre-cooling tunnel (I and II)

Pre-cooling tunnel (I and II)Electric and control cabinets

Sieve- and wind-sifter station

After intense research and development, INTEC brought a prototype in its own factory in France to operation in 1986 – the plant series INTEC RC 400/01




Copyright (c) 2014 All rights reserved. www.intec-rubber-powder.com / www.intec-energies.com. | Imprint | Design by FreeCSSTemplates.org.